What This Altadena Roof Replacement Actually Involved
This was not a simple shingle swap. By the time the old roof came off a hillside ranch home on Canyon Dell Drive in Altadena, the crew had uncovered rotted decking, a hole that opened straight through to the framing below, and a chimney detail that had been failing for years. The finished product, new plywood across every plane, new metal flashing at the chimney, and a full architectural shingle field with new hip and ridge caps, is a fundamentally different roof than the one that existed before September 2025.
The home is a long, low-pitched single-story ranch set into the San Gabriel foothills, with a courtyard entry, deep eaves with exposed rafter tails, and canyon views to the north. That style of construction, common across Altadena’s mid-century neighborhoods, tends to produce large, continuous roof planes that shed UV exposure and heat every day of the year. Altadena sits at roughly 1,300 feet elevation and regularly sees summer temperatures above 95°F, conditions that accelerate granule loss on asphalt shingles and bake out the bitumen that holds them together.
Project Gallery
The homeowner’s immediate concern was the chimney. Water had been getting in near the fireplace, and a previous patch had not held. What the inspection on August 28, 2025 showed was more extensive: the shingles were worn field-wide, and the decking underneath had weakened enough in at least one location to be a structural concern.

What Did We Find When We Got on the Roof?
The August 28 inspection confirmed two distinct problems: surface-level granule loss across the entire shingle field, and a compromised chimney flashing that had been patched with tar rather than replaced with metal. Either issue alone might have justified a targeted repair; together, and given the age of the decking, they pointed clearly toward a full replacement.
The shingles told their story up close. Asphalt shingles rely on their embedded mineral granules to reflect UV radiation and protect the bitumen layer beneath. When those granules wear away, a process that accelerates significantly after a shingle passes roughly the 20-to-25-year mark, according to the National Roofing Contractors Association, the exposed asphalt dries and becomes brittle. The shingles on this roof had reached exactly that stage: uneven color, bare patches in the tab surfaces, and edges that had begun to curl. No localized repair addresses granule loss across the full field; at that point the roof has simply aged out.
The chimney situation was more urgent. The counterflashing where the brick met the roof plane had corroded, and the mortar wash at the chimney base had crumbled away, leaving a gap at precisely the spot where water concentrates during any rainfall. A tar and sheet-metal patch had been applied at some point to buy time, but that patch had cracked and lifted at its edges. Water running off the chimney face had a clear path into the roof assembly.
On re-roofs, we almost always find the original flashing still in place at the chimney, and that is usually where the leak the homeowner called about actually starts. The chimney flashing is one of the few points on a hip roof where water can enter from multiple directions simultaneously, and tar patches give out as the underlying metal expands and contracts with seasonal temperature swings.

The Chimney: Why a Patch Was Never Going to Hold
The failed flashing at the base of the brick chimney was the clearest single defect on this roof, and it required complete removal and replacement with new metal, not another round of sealant. The photo from the August inspection shows the full extent of the problem: peeling tar, cracked sealant bead, and exposed sheet metal that had oxidized through its surface coating.
Chimney flashing on a shingle roof is typically a two-part system. Step flashing pieces weave in between individual shingle courses as they climb the chimney sides, and counterflashing is then set into a reglet cut into the mortar joints and lapped over the step flashing. When mortar joints soften and crack, the counterflashing loses its mechanical anchor. Once water gets behind the counterflashing, it tracks along the brick face and pools at the base, which is exactly what had happened here.
The tar patch visible in the inspection photo had been applied directly over failing metal rather than replacing it. Roofing tar is not a permanent flashing material; the California Contractors State License Board (CSLB) reminds homeowners that temporary repairs do not substitute for code-compliant permanent installations. By the time the old shingles came off, the base of the chimney had sustained enough water intrusion to contribute to the decking deterioration nearby.
New metal step flashing and counterflashing, properly integrated with the new shingle courses, was set as part of the September installation. No sealant was used as a primary waterproofing element.

What Was Underneath: The Case for Full Re-Decking
When the old shingles and underlayment were stripped back, the decking beneath was in worse shape than the surface had suggested, including at least one location where the plywood had deteriorated completely through, opening a hole directly to the roof framing below. That discovery made re-decking the only responsible path forward.
The tear-off began September 11, 2025. As the shingle layers came off, the age and condition of the original decking became visible. Roof decking on a home this age is typically one of two materials: plank sheathing or early-generation plywood. Both can survive for decades when kept dry, but once water has found a path past a failed flashing or through a cracked shingle field, the wood begins to soften, then to split, then to fail structurally. The hole visible in the mid-teardown photos was not a small soft spot; it was an opening large enough to see through to the rafters and the insulation below.
Split boards and areas of soft, delaminated plywood were distributed across other sections of the deck as well. Installing new shingles over compromised decking creates a future failure point: fasteners cannot achieve proper withdrawal resistance in softened wood, and the uneven surface telegraphs through to the new shingle layer over time. The decision to re-deck completely eliminated that risk.
New plywood panels were fastened across all roof planes. The crew worked in sections, replacing old boards as they went, then covering the open deck with plastic sheeting at the end of each workday to protect the framing and interior from any overnight moisture. That daily weather protection continued through each stage of the installation.

Re-Decking and Installation: September 11 to September 15, 2025
The re-decking phase ran through September 11 and 12, with new full-sized plywood panels fastened across every plane of the hip and gable roof. Once the new deck was solid and flat, underlayment went down, followed by the full shingle installation, new vents, and new hip and ridge caps.
The photos from September 11 show 3 crew members working simultaneously across the hip planes, running fresh plywood panels along the ridge line and nailing them into the rafters below. The pace of that work matters on a re-deck job: every hour of open decking is an hour of weather exposure for the interior of the home. The crew prioritized getting the structural deck closed before laying underlayment.
With the deck complete, the installation sequence followed standard California re-roofing practice: underlayment across the full field, drip edge at eaves and rakes, new step and counterflashing at the chimney, new pipe boots at the two plumbing penetrations, new roof vent caps, and then the architectural shingle field itself, laid in staggered courses from eave to ridge. Hip and ridge cap shingles finished each of the converging roof lines visible in the aerial view.
The hip roof geometry on this particular home creates 4 distinct sloping planes that all meet at a central peak, with additional gable planes at the wing of the building. Each intersection required careful alignment of the shingle courses and precise cutting at the hip lines to ensure consistent exposure and clean sight lines from the canyon below.

The Finished Roof: What Changed
The completed roof, photographed September 15, 2025, shows a uniform field of new architectural asphalt shingles across all planes, with matching hip and ridge caps, properly set pipe boots, and new vent caps at all penetrations. The color selected by the homeowner complements the tan and brown tones of the stucco and trim that characterize this part of the Altadena hillside.
Architectural shingles, also called dimensional or laminate shingles, differ from the 3-tab shingles they replaced in one important structural way: they are manufactured from 2 bonded asphalt layers rather than a single layer, which gives them greater thickness, more resistance to wind uplift, and a shadow profile that reads as more visually substantial on a low-pitched roof. California’s residential construction environment, with its combination of heat, UV, and periodic high winds off the San Gabriel range, makes the heavier construction of an architectural product a sensible baseline choice for any full replacement.
The chimney now has proper metal flashing at all 4 sides, integrated with the new shingle courses. The 3 roof vents visible in the completed aerial photograph are new units set into fresh decking, with proper collars and caps rather than the corroded originals. Each pipe penetration is sealed with a new rubber-collared boot flashed into the shingle field.
From the canyon view, the home presents a clean, consistent roofline for the first time in many years. The low eave lines and deep overhangs that define its mid-century ranch character are intact, and the new shingle color reads as a natural continuation of the existing exterior palette.
Ready to Inspect Your Roof Before It Reaches This Stage?

The roof on Canyon Dell Drive had reached a point where deferred maintenance had compounded into a significantly larger scope of work. Had the chimney flashing been addressed several years earlier, the decking damage near the chimney base might never have developed. Had the granule loss been caught during a routine inspection, the homeowner would have had more time to plan the replacement on their own schedule rather than around active water intrusion.
If your home is in Altadena or the surrounding San Gabriel foothills communities, and your roof is more than 15 years old, a physical inspection is the most direct way to understand what condition the decking and flashings are actually in. Roof Replacement Inc is licensed by the California Contractors State License Board (CSLB) and carries out full shingle replacements, chimney flashing repairs, and complete re-decking projects across the region.